01Case study · Salvage
Preventive booming for a 32,000-tonne ship-to-ship transfer.
Gulf of Kutch, Kandla Port · Salvage of MT Genessa · January 2018

The challenge
During the salvage of the Indian-flag tanker MT Genessa, 32,000 tonnes of High-Speed Diesel had to be transferred ship-to-ship to a daughter vessel. Resolve Fire and Salvage Americas awarded JVM the contract for lease rental and preventive booming of deep-sea air inflatable boom, to tackle any spillage on site.
Preventive booming was integral to the salvage. Any spill would have seriously endangered the mangroves and aquatic life of an eco-sensitive zone in the Gulf of Kutch, the gateway through which India imports 70% of its oil.
Our operation
The JVM Offshore Operations team worked from a risk assessment of the STS operational plan and real-time weather and tidal data. From these they defined the most efficient way to garland the site with minimal hindrance to the transfer. Air inflatable boom was laid across the starboard stern of the daughter vessel and the port bow of the casualty vessel.
Internationally trained IMO Level 1 and 2 responders were mobilised in record time. For the full 100 hours of defuelling, Elastec booms protected the site, supervised round the clock by JVM responders.
02Case study · Exploration
Offshore readiness for the Dwarka‑1 exploration well.
Mundra, Gujarat · Cairn – Vedanta – Halliburton · approx. 3 months

Scope
JVM was awarded the contract for lease rental and preventive maintenance of oil spill response equipment, and for periodic drills at the Dwarka-1 site. All OSR equipment and IMO Level 1 & 2 technicians were kept on standby, on board and at the OWS yard, in line with Risk Category B of ports.
Boom deployment drill
The boom was unspooled from its reel and partly laid flat on deck. Its chambers were inflated and it was lowered into the water over the vessel roller. Seven sections went in, approximately 210 metres with ten air chambers per section, or 70 chambers in all.
The boom aligned with the current, and the vessels moved downstream into the trajectory of the slick, matching position and relative speed between the rig and the bridges of BL 313 and Thai Binh. The boom was then formed into a U/J configuration for oil collection. Both vessels moved against the current at a relative velocity below 1 knot to maximise recovery. Finally the vessel crane lowered a weir skimmer from the starboard side of BL 313, the power pack was connected and the pump started.
03On site
Dwarka-1: equipment, response team and support vessels.
04Selected references
Trusted by salvors, operators and terminals.
| Client | Location | Scope | Term |
|---|---|---|---|
| Resolve Fire and Salvage Americas | Gulf of Kutch, Kandla Port | Lease rental and preventive booming for the STS transfer of 32,000 t HSD | Jan 2018 |
| Cairn – Vedanta – Halliburton | Dwarka-1, Mundra, Gujarat | OSR equipment rental, preventive maintenance and periodic offshore drills | ≈ 3 months |
| Cairn – Vedanta – Asian Energy Project | Vedanta Facility, Suvali, Hazira, Gujarat | Annual maintenance and servicing of installed OSR equipment | Annual |
| Halliburton Offshore Services | Kakinada Onshore Terminal, Andhra Pradesh | Provision of OSR manpower | 3 years |
| T & T Salvage Asia Pte. Ltd., Singapore | Offshore containment project, Okha, Gujarat | OSR equipment and IMO Level 1 & 2 technicians and supervisors, Category B, day-rate basis | Day rate |
| Schlumberger Asia Services Pvt. Ltd. | Krishnapatnam Port, Andhra Pradesh | OSR equipment on rental and manpower | 1 year (2018–19) |
| Simar Port Pvt. Ltd. | Chhara Port, Gujarat | OSR equipment on rental and deputation of IMO-level OSR technicians | 2 years |
| Ennore Tank Terminal Pvt. Ltd. (ETTPL) | Chennai, Tamil Nadu | Supply and deployment of 1,000 m Solid Perma Fence Boom | 2019 |